Home | Bauer Group |
 
 
Post Grouted Bored Piles
Conventional Bored Piles
Diaphragm Walls
Berlin Walls
High Pressure Injection
Permeation Grouting
Dewatering Works
Micro Piles
Secant Piles Walls
Cut-off Walls
Ground Anchors
 
Permeation Grouting
The Permeation Grouting is the process of injecting grout into the pores of a granular soil in accordance with DIN-4093.

The horizontal grouted cut-off blankets have to fulfill no structural function at all in terms of a specified material strength and are, therefore, located at a depth below the base of an excavation at which adequate safety against uplift is established. When carrying out a check for safety against uplift, the horizontal grouted cut-off blankets are assumed to be completely impermeable with an imaginary membrane lying at its base.

 

 

              

                 

 

 

Copy Right©2015 Bauer Egypt.  All rights reserved >