Experience Record for Secant Piles Wall
Year Project Name Location (Egypt) Client Consultant/
Architect/
Engineer/
Contract
Value
(L.E.)
Project Duration (Month) Piles dia. (mm) Total No. Of Piles Pile Length (m) Spacing Between Piles (mm) Concrete Quality Retained Excavation Depth (m) No. Of Rows Of Struts/ Anchors Remarks
primary piles secondary piles
1991 Damietta Power Plant Damietta Dailem Indust. Company Hamza Associates 700,000 3 800 120 20 0.65 B 10 B 30 6 1
1993 Abuel-Rish Hospital Abul Rish Arab Contractors Dr.S.Sabry 300,000 2 650 130 15 0.45 B 10 B 30 6 1
1993 Dar El-Salam Swerage Tunnels Cairo Egyptian Arabian Cont. Co. Hamza Associates 2,700,000 6 650 550 16 0.45 B 10 B 30 7 1
1994 G.W. Tank at Suez Water Station Suez El-Quanah for Ports Works Suez Canal Authority 1,300,000 4 650 520 10 0.45 B 10 B 30 5 1
1994 Ismalia Waste Water Contract Ismailia Egyptian Arabian Cont. Co. Hamza Associates 1,700,000 6 650 285 20 0.45 B 10 B 30 6-8 1
1995 El-Kantara W.W Contract Port Saud Egyptian Arabian Cont. Co.
800,000 3 650 150 19 0.45 B 10 B 30 6 1
1997 New Bar Mill Plant El-Dekhila KAJIMA KAJIMA 600,000 1 800 105 16 0.45 B 10 B 30 6.5 _
2001 New Delta Lock El-Kanater Kanater El-Nile Co. for Roads & Bridges ACE 800,000 3 650 260 21 0.5 B 10 B 30 6 _
2004 Zagazig Pumping Station Phase II Zagazig Societe Egyptienne D'Enterprises Mokhtar Ibrahim KAJIMA 1,710,200 5 600 380 12 0.9 B 10 B 30 6 1
2005 Mr. Yaseen Administrative Building Cairo Mr. Yaseen Al-Shokairy
738,500 2 650 106 13.5 0.50 B 10 B 30 10 2
2005 Pumps Room For A Hotel In Hurgada Hurgada Misr For Invistement Dr. Ezzat Abdul-Rahim 1,015,000 5 650 268 7 0.5 B 10 B 30 4 _
2005 Merowe Dam Project Sudan Bauer Spezialtifbau GmbH CCMD Joint Venture 2,689,328 4 1200 59 25 0.95 B 10 B 30 8.5

2006 Sofitel Pump Station Cairo CCC Ehaf. 620,000 3 800 64 25 0.5 B2 B2 9 _
2007 cultural and recreational complex project Port Saud Feteih company for constracting IDEA Center For Integrated Design 1,215,025 3 900 27 10 0.90 B 10 B 30


2008 New Cairo Housing Bank New Cairo Arab Contractors ABG 4,600,000.00 3 650 350 10-15 0.8 B10 B 10 7 to 10 2
2010 Sky Medical Center Cairo Arab Contractors Enpy 480,000 1 800 80 15 0.95 1
8

2014 Head quarter of petrotrade company Cairo Wadi EL-Nile Wadi EL-Nile 4,350,000 3 600 382 15 0.5

7 2
                             
   
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 

Copy Right©2015 Bauer Egypt.  All rights reserved >