Home | Bauer Group |
 
 
Damitta silo
Marselia
Sayphon under suez canal
smoha grand view
zayan
 
Zayan Tower Complex

Project: Zayan Tower Complex

Location: Semouha_ALXandria

Client: Mr. Hamdy Zayan

Consultant: Dr. Essam Kassem

Budget: 39,500,000 EGP

Scope of work:      

  • 1-Diaphragm Wall Works:

    Construct outer diaphragm walls with thickness 80 cm and Depth of walls is up to 30meter. Total quantity of executed diaphragm wall is 12,784square meter

     

  • 2-Groundwater Control System

 

Bauer Egypt was responsible for the supply and installation of complete groundwater control system comprising 15 deep wells, piping works and alarm system.

The controlling system is expected to run for about 20 months

 

Project Duration:

  • 1-Diaphragm wall works and barrettes : 6 months
  • 2-Running of Dewatering works : 20 months

 

 

Copy Right©2015 Bauer Egypt.  All rights reserved >