Project: Serapum syphon under the new Suez Canal

Location: Suez Canal

Client: Concord for Engineering and contracting

Consultant: Consulting Engineering office

Year of construction: 2014

Budget: 52,686,000 EG.P

Project description

Concord for Engineering and contracting company awarded BAUER EGYPT the construction of 4 circular shafts for lunching and receiving the TBM required to construct 4 tunnels, each is 3.2 meter diameter to underpass the irrigation water canal (El- Sheikh Zayed Canal) under the new Suez Canal

Scope of work:

  • 1-Diaphragm Wall Works:

    Construct diaphragm wall shafts thickness 120 cm and Depth of walls is up to 120 meter. Total quantity of executed diaphragm wall is 24000 m2

     

  • 2-Soft Gel Grout Plug Works

    Supply & construct soft gel plugs at a depth of 120 meter. Plug thickness 10.00 meter.

  • 3-Micro piles works

Construct of 120 no of uplift piles capacity 120 ton to a depth of 120m

 