Project: Damietta metal silos

Location: Damietta                                                             

Client: EL Gharably Engineering Company

Consultant: Nile engineering consulting Bureau

Budget: 12,677,500 EG.P

Project description

As one of the requirements of the development of the port of Damietta, General Silos and Storage Company decided to establish a metallic silo with a storage capacity of 70,000 tons, consisting of 10 storage cells diameter 25 m

Scope of work:

  • 1-Bored piles Works:

Construct of about (586) no. of piles with diameter (100)cm and depth (34)m  .

Project Duration:

  • 1-Bored piles : 4 months

 