Project: Qatari Diar complex

Location: Cairo

Client: OCI_BESIX

Year of construction: 2008

Budget: 28,429,000 EGP

Project description

The biggest largest project in year 2008 at Cornish EL-Nile

 Scope of work:                      

  • 1-About 335 no. of Bored piles with diameter 100cm and depth 28m

     

  • 2-Construct of about 11,790m2 of diaphragm wall with thickness 80 cm and depth 35m to deep excavationup to 14m deep

     

     

  • 3-Post grouted ground anchors:

        1st row above ground water table about 192 no. of anchors

        2nd row below ground water table about 383 no. of anchors

     

  • 4-Ground water control by using dewatering system

     

  • 5-Pile load test on piles up to 1440 ton

     

     

  • 6-Sonic coring test

 

 

3

 