Al Wasta Nile bridge
Aswan Nile Bridge
Banha Nile Bridge
Kafer AL ZAYAT Nile Bridge
 
Banha Bridge over the Nile River

Project: Banha Bridge over the Nile River.

Consultant: ACE (Moharram Bakhoum)

Location: Banha– Egypt          

Year of construction: 2010

Budget: 6,320,000 LE

 

    Type of Works:   Pilling works

  • 1500 linear meter of piles with diameter 2000 mm, length 47 meter allowable compression load 1650 tons.
  • Project description:

 

Bauer is awarded to execute the Banha Bridge, it is the first time in Egypt to be implemented piles with diameter (2) m in watercourse

 

 