Home | Bauer Group |
 
 
Al Wasta Nile bridge
Aswan Nile Bridge
Banha Nile Bridge
Kafer AL ZAYAT Nile Bridge
 
Aswan Nile Bridge

Project: Aswan Nile Bridge

Consultant: ACE (Moharram Bakhoum)

Location: Aswan– Egypt         

Year of construction: 2013

Budget: 8,000,000 LE

 

Scope of Works:  

  • Off shore piling , 24 piles dia 2.0 m – Depth 53 m
  • Offshore piling 36 piles dia 1.0 m depth 45 m
  • Offshore trial pile ( test load 3500 ton )

    Period 

  • 6 Months( Dec2013 -June 2014 )

 

Copy Right©2015 Bauer Egypt.  All rights reserved >