Project: Union National bank

Location: Giza             

Client: Union national bank

Year of construction: 2013

Budget: 15,000,000 EG.P

Scope of work:

  • 1-Diaphragm Wall Works:

    Construct diaphragm walls with thickness 80 cm. Depth of walls is up to 28 meter. Total quantity of executed diaphragm wall is 3,760 square meter

     

  • 2-Soft Gel Grout Plug Works :

    Grout a soft gel plug at a depth of 28 meter from the street level. Plug thickness 2.00 meter. Grouted area is 2,400 square meter.

  • 3-Bored piles works:

 

90 no. of piles with dia. 1500mm and 1000 mm and depth 32 m

 

 

 