Project: Secon Maadi Towers

Location: Cairo                                                

Client: Arabtic-Siac JV

Year of construction: 2013

Budget: 68,500,000 EG.P

Scope of work:

  • 1-Diaphragm Wall Works

    Construct inner and outer diaphragm walls with thickness from 64 cm to 80 cm. Depth of walls is up to 30 meter. Total quantity of executed diaphragm wall is 11,400 square meter

     

  • 2-Soft Gel Grout Plug Works

    Grout a soft gel plug at a depth of 30 meter from the street level. Plug thickness 2.00 meter Grouted area is 9,000 square meter.

  • 3-Bored piles works:

    Construct of 1100 no. of Bored piles with diameter 100cm and length 28m

  • 4-Anchors and strutting system

 

About 297 anchors at 2 rows of anchors and strutting system

 

 

 