Development Milestones

1981

Bauer Egypt's establishment as a joint stock company between Bauer Spezialtiefbau GmbH and several Egyptian shareholders.


Bauer Egypt's first piling contract; BAHER TOWER.


The introduction and implementation of the Bauer System post Grouted Bored Piles.


The introduction and implementation of the post grouted ground anchors as a reaction system for compression pile load tests.

 

Description: http://bauer.it4egypt.com/upload/image/company_profile/bg_11.jpg

 

 

 

 

 

 

 

 

 

 

 

First Bauer Egypt BG-11

 

1985

Bauer Egypt's increase in market share and resources reaches about 200%.


Bauer Egypt's first major project; piling works for The Agha Khan Towers at a value of approximately five million Egyptian Pounds.

Description: http://bauer.it4egypt.com/upload/image/mansoura02.jpg

 

. El-Mansoura Bridge

 

 

1990

Bauer Egypt's first off shore piling contract;Mansoura Bridge.

1994

Bauer Egypt's purchase of its first state of the art Trench Cutter the BC 15.


Bauer Egypt's first
Diaphragm Wallproject; Shafts for the Waste Water Project in Alexandria.

Description: http://bauer.it4egypt.com/upload/image/company_profile/BC_15.jpg

First Bauer Egypt BC-15

 

 

1995

Bauer Egypt's purchase of the state of the art Jet Grouting equipment.


Bauer Egypt's first Tanking System project; Safir Hotel Extension, comprising of a laterally supported Diaphragm integrated with a horizontal Jet Grouting Blanket at its toe.

1997

Bauer Egypt's equipment fleet is enforced with two additional piling rigs and the advanced BC 30 Trench Cutter.


The development and installation of Post grouted Ground Anchors under static water head.

Description: http://bauer.it4egypt.com/upload/image/company_profile/ubw8.jpg

UBW-8

1998

Bauer Egypt's purchase of the state of the art Permeation Grouting equipment for Grout Blankets using soft gel.

Description: http://bauer.it4egypt.com/upload/image/company_profile/BG_40.jpg

BG-40

1999

Bauer Egypt's equipment fleet is further increased with the purchase of two advanced piling rigs; the BG 15 and the BG 40.

2000

Bauer Egypt's awarded the largest to date private sector project;The San StefanoCommercial and Residential Complex, at a value of approximately 120 Million Egyptian Pounds.

Description: http://bauer.it4egypt.com/upload/image/San_big.jpg

 

2000-San Stefano – Alexandria

2003

Bauer Egypt enforces itsequipment fleetwith two mini piling rigs for installation of bored piles in limited height & spaces.

2004

Bauer Egypt'sequipment fleetis further increased with the purchase of the BG 30 piling rig and the BC 30 Trench Cutter.

Description: http://bauer.it4egypt.com/upload/image/Picture0006.png

 

2007- Cairo Metro Line(3)

 

2007

Bauer Egypt awarded, the most geotechnical demanding & prestigious project in Egypt,Cairo Metro Line 3,at a value of approx. 170 Million pound.


Chemical grouting resources further increased with purchasing an advanced chemical grout station of 13 pump capacity & online mixing facilities.

 

 

2008

Bauer Egypt’s equipment fleets enforced with 2 no BG28 rig with extend mast for one shot drilling up to 40 m.

Description: http://bauer.it4egypt.com/upload/image/company_profile/klemm803.png

2010_2Anchor Rig _ Klemme

2010

Bauer Egypt's equipment fleet is further increased with the purchase of two advanced Anchors rigs; KR803 and KR806.

2012

 

Bauer Egypt awarded the geotechnical works for New Assuit Barrage

 

BAUER EGYPT has successfully executed the first cutter project with the new advanced system for Single phase cut off wall

2013

Bauer Egypt executed ( first time in EGYPT ) offshore piling with diameter of 200 cm for BANAH NILE BRIDGE

 

As well , based on this success BAUER awarded Aswan Nile bridge offshore piling with also 200 cm diameter and 53 m depth

 

Aswan Nile bridge has been successfully executed on year 2014

2013

Bauer Egypt's awarded the largest to date private sector project Smuha Grand View Commercial and Residential Complex, at a value of approximately 115 Million Egyptian Pounds.

2014

Bauer Egypt's equipment fleet is further reinforced with one new city trench cutter MC128

The new cutter capable to drill up to 120m with thickness up to 1.5 m , the cutter will execute 2 shafts for TBM with diameter on 18.2 m and depth 100m . the works are part of Sarapiuom Syphon under new Suez canal

 