Altalatiny tunnel
Cairo metro line 3 phase 1
Cairo metro line 3 phase 2
El Oroba Tunnel
Four-season Nile plaza
San stefano complex
TTC Tripoli
USKUDAR Metro station
 
El Oroba Tunnel

Project: ElOroba Tunnel

Location: Cairo                

Client: Arab Contractor

Year of construction: 2003

Project description

  • Salah Salem road is one of the major and most important traffic route in Cairo
  • The EL Oroba tunnel was executed to eliminate the bottle necks causing the traffic jams on that route
  • The tunnel was executed using the cut and cover system

 Scope of work:

  • 1-Diaphragm Wall Works:

Construct diaphragm walls with thickness 80 cm. Depth of walls is up to 18 meter. Total quantity of executed diaphragm wall is 28,600 square meter

 