Home | Bauer Group |
 
 
Altalatiny tunnel
Cairo metro line 3 phase 1
Cairo metro line 3 phase 2
El Oroba Tunnel
Four-season Nile plaza
San stefano complex
TTC Tripoli
USKUDAR Metro station
 
Cairo metro line 3 phase 2

Project: Cairo Metro Line (3) Phase (2):

Location: Cairo

Client: National Authority for Tunnels

Main contractor: Egyptian French joint venture for Cairo metro line 3

Year of construction: 20108-2012

Budget: 85,000,000 EG.P

Project description

This stage of Cairo metro line (3) consist of five stations (Cairo fair – stadium – kolleyte elbanat – al-Ahram

Haroun station)

 

Scope of work:

  • 52,000 m2 of diaphragm Wall
  • 170 Barrette with steel posts
  • 7 circular shafts
  • Jet grouting & TAM for hard points

 

Copy Right©2015 Bauer Egypt.  All rights reserved >