Cairo metro line 3 phase 1

Project: Cairo Metro Line (3) Phase 1:

Location: Cairo

Client: National Authority for Tunnels

Main contractor: Egyptian French joint venture for Cairo metro line 3

Year of construction: 2008-2010

Budget: 180,000,000 EGP

Project description

Bauer Was awarded to execute Four Stations and five annex of phase (1) _consist of five stations_ the stations

located in (abbasia – abdu basha – elgeish – bab elsharia)

                                                          

Scope of work:

  • 1-Diaphragm Wall Works:

    Construct diaphragm walls and barrettes with thickness from 80 cm to 120 cm. Depth of walls is up to 60 meter. Total quantity of executed diaphragm wall is 114,000 square meter

     

  • 2-Soft Gel Grout Plug Works

Grout a soft gel plug at a depth from 40 to 60 meter from the street level. Plug Varies thickness from 3 to 8.5 m. Grouted area is 18,000 square meter.

 