Altalatiny tunnel

Project: Ismailia Tunnel

Location: Ismailia

Client: Hassan Allam

Budget: 69,500,000 EG.P

Project description

Ismailia governorate decided jointly with the Engineering Authority of the Armed Forces execution of the project to prevent traffic crises and protect the lives of people from the dangers of the railway. The main scope of work is to construct a retention system –diaphragm wall and controlling of ground water by suing chemical base plug.

The project has started in 03/12/2013 and finished by end of 2014

 Scope of work:                                 

  • 1-Diaphragm Wall and Barrettes Works:

    Construct inner and outer diaphragm walls and barrettes with thickness from 80 cm to 100 cm. Depth of walls is up to 25 meter. Total quantity of executed diaphragm wall is 32,891 square meter

     

  • 2-Soft Gel Grout Plug Works

Grout a soft gel plug at a depth of 25 meter from the street level. Plug thickness 2.00 and 6.00 meter. Grouted area is 8,172 square meter.

 

 

 